Block paving, tarmac, resin or stone: choosing a driveway material in Cheltenham
By Janice · Updated 2026-06-11
Most people choosing a driveway surface end up circling between the same four options: block paving, tarmac, resin bound, and natural stone. Each does something well and gives something up, and the right answer depends more on how you’ll use the space and how much upkeep you want than on which one looks best in a photo. Have a look through local driveway contractors once you’ve narrowed your options, since most will lay more than one of these materials and can talk through what suits your specific site.
The four main options, compared
| Material | Durability | Maintenance | Permeable option? | Best for |
|---|---|---|---|---|
| Block paving | 20+ years | Re-sand joints every 3-5 years | Yes, with permeable jointing | Pattern flexibility, easy spot repairs |
| Tarmac | 15-20 years before resurfacing | Low, occasional crack sealing | No | Fast installation, tight budgets |
| Resin bound | 15-25 years | Low, occasional wash | Yes, inherently permeable | Smooth finish, good drainage |
| Natural stone | 20+ years | Occasional re-pointing | Depends on jointing | Kerb appeal, period properties |
Block paving: flexible and repairable
Block paving’s biggest practical advantage is that it’s made of individual units. If one section sinks or a block cracks, a contractor can lift just that patch and relay it without disturbing the rest of the driveway. That makes it the easiest material to spot-repair years down the line. It comes in enough colours and laying patterns that most people can match it to the house, and permeable block paving (laid with open joints over a permeable sub-base) can satisfy drainage rules without changing the look much at all.
The trade-off is joint maintenance. Weeds and moss will find their way into the joints over time, and most owners re-sand or re-seal every few years to keep the surface tight.
Tarmac: fast and low-fuss
Tarmac is usually the quickest material to install and among the least demanding once it’s down. It handles vehicle weight and slopes well, which makes it a common choice for longer or steeper driveways. Its main limitation is that it’s not permeable, so a new tarmac driveway over 5 square metres typically needs planning permission unless drainage is engineered separately, and its colour and texture options are limited compared with block paving or stone.
Resin bound: smooth and permeable by design
Resin bound surfacing mixes aggregate with a clear resin and trowels it to a smooth, joint-free finish. It’s inherently permeable, so it clears the planning permission hurdle for most typical driveways without extra design work, and it doesn’t develop the loose stones that resin bonded or gravel surfaces can. It costs more than tarmac or gravel and needs the sub-base prepared properly, since a resin surface laid over a poor base will crack the same way any other surface would.
Natural stone: the premium, period-friendly choice
Indian sandstone and similar riven natural stone give a driveway a warmer, more traditional look that suits period properties particularly well around Cheltenham’s Regency terraces and Cotswold-edge villages. It’s the highest material cost of the four and needs re-pointing over time as mortar joints weather, but a well-laid stone driveway is one of the longest-lasting options available.
How to actually decide
Start with how the driveway will be used. A steep or heavily used driveway favours tarmac or block paving over gravel. If avoiding planning permission matters to you, lean toward a permeable option. If you want a specific look to match the house, block paving and natural stone give the most control. And if long-term maintenance effort is the deciding factor, tarmac and resin bound both ask the least of you.
Whichever direction you lean, ask a contractor to walk through how the sub-base will be prepared for your chosen material specifically, since that matters more to how long the driveway lasts than the surface material itself. Our scoring method weighs completeness and workmanship signals from real customer feedback, which is worth checking before choosing who does the work.
Compare a few local options on the directory homepage before committing, since pricing and availability both vary contractor to contractor.
FAQ
- Which driveway material lasts the longest?
- Natural stone and well-laid block paving both typically last 20+ years. Tarmac usually needs resurfacing after 15-20 years, and resin bound surfaces last 15-25 years depending on how the base was prepared.
- Which driveway material needs the least maintenance?
- Tarmac and resin bound both need the least upkeep, an occasional wash and the odd crack sealed. Block paving needs joints re-sanded every few years and gravel needs regular raking and topping up.
- Is a permeable driveway material worth choosing?
- It's worth it if it lets you avoid needing planning permission, since a new impermeable driveway over 5 square metres in England normally requires it. Permeable block paving, resin bound and gravel all qualify; standard tarmac and mortared stone don't.
- What's the best material for a sloped driveway?
- Block paving and tarmac both handle a slope well because they're rigid once laid. Loose gravel tends to migrate downhill on anything steeper than a gentle incline, so it's best avoided on slopes.
Related on this site
- Browse driveway paving providers
- What a new driveway costs in Cheltenham and what changes the price
- Do you need planning permission for a new driveway in Cheltenham?
- A first-time guide to getting your driveway paved in Cheltenham
- What to expect when you hire a paving contractor, from quote to completion
- All guides →